HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).

YEAR COMPANY PROJECT SERVICE
2015 CONSORZIO MONSERRATO NEW UNIVERSITY BUILDINGS
MONSERRATO (CA)
Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Laboratory TAB
2015 BILFINGER SIELV CHIOGGIA HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 ITEC MANGIAGALLI HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 SCOTTA New Ospital CO.RE Reggio Emilia DALT Duct Air Leakage Test ( Prova di tenuta canali aeraulici)
2015 BILFINGER SIELV BELLUNO HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning sterilization department.
2015 BILFINGER SIELV VIZZOLO MN HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 CIAB New Ospital B.go Roma Verona DALT Duct Air Leakage Test ( Prova di tenuta canali aeraulici)
2015 BILFINGER SIELV NEW BUILDING UNIVERSITY CA FOSCARI VENICE Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms
2015 BILFINGER SIELV PADOVA HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms
2015 Cefla Impianti UNIPOL CED BOLOGNA Testing adjusting and balancing activities for heating, ventilation and air conditioning
2015 MEREGALLI BOLTON ALIMENTARI Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 Cefla Impianti UNIPOL MILANOFIORI Testing adjusting and balancing activities for heating, ventilation and air conditioning
2015 STUDIO ALTIERI DUBAI (AL JALILA HOSPITAL) Functional test for heating, ventilation and air conditioning system.
2015 COSAP US NAVY BUILDINGS Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 CARLO GAVAZZI AREA EX-BOSCHI PARMA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Stazione, Hotel, reidencial building
2015 Cefla Impianti UNIPOL TORRE TIKAL MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning
2014/2015 Cefla Impianti CITY LIFE – TORRE ISOZAKI – MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system.
Energy Saving Building
2014/2015 GIANNI BENVENUTO COVEXPO MILANO N. 7 BUILDINDS Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings
2014 GIANNI BENVENUTO Marriott Hotel Sacca Sessola Venezia Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2014 USL2 LUCCA Construction of Four New Hospitals Testing adjusting and balancing activities for heating, ventilation and air conditioning of large equipment : CAT, MRI Scan, Computerizing Tomography.
2014 BAL.CO Construction of five new residential buildings Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system
2014 CIAB New Ospital ward Santobono Naples Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2014 CIAB Rocchetta Mattei Castle Testing adjusting and balancing activities for heating, ventilation and air conditioning. Functional test VRV system.
2014 CIAB Nova Coop Vercelli Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 AUSL MODENA Osp. di Carpi Comparto Operatorio Verifica del flusso laminare su diffusore a plafone sale operatorie.
2013 Merlo Lino Impianti Osp. di Carpi Comparto Operatorio Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 Co. Sat. Osp. Prato Construction of Four New Hospitals Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 Rosetti Marino S.P.A. West Franklin oil platforme Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 Co. Sat. Osp. Pistoia Construction of Four New Hospitals Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2014 A & T New Hospital Modena Baggiovara Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
2013 Cefla Impianti Politecnico Milano Laboratori di Ingegneria Nucleare Testing adjusting and balancing activities for heating, ventilation and air conditioning included firefighting system.
2012/2013 Meregalli s.r.l Nuovo Palazzo Uffici Generali Viale Don Sturzo (Milano) HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System.
2012/2013 Serfrigo srl Kashagan Experimental Programme Kazakistan HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air distribution System. Buildings Blower Door Test.
2012 London Stock Exchange Group Holdings Italian Branch Borsa di Milano Performance test of Heating, Ventilation and Air Conditioning system
2012 CIAB s.c.a.r.l Ospedale Rizzoli Bologna HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. Operating Rooms.
2012 STIM srl GENOVA HIGH TECH S.p.A. Technical supervision for the testing adjusting and balancing activities of heating, ventilation and air conditioning included firefighting system.
2012 Gesco srl Shipyard Sestri Ponente “OCEANIA RIVIERA” HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2011/2012 Cefla Impianti Yard Porta Nuova Garibaldi Milano Technical supervision for the testing adjusting and balancing activities of heating, ventilation and air conditioning included firefighting system.
2011/2012 SIRAM S.p.A. New Hospital Cona (Ferrara) Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2011 JV Skema Tozzi DI Temporary Refuge Kashagan Experimental Programme HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. Caibration and Loop check with building automation System.
2011 CIAB s.c.a.r.l Museum Palazzo Fava Bologna HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2011 Techint S.p.A. EMethanex Damietta Egypt HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2010/2011 CIAB s.c.a.r.l New Hospital Giovanni Paolo II Olbia Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2010/2011 NOB New Hospital Bergamo Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo) n° 36 Operating Rooms, n°226 Laboratories, n°1200 Hospital Beds, 320.000 Square meters.
2010/2011 CIAB s.c.a.r.l New Hospital S.Orsola Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System
2010/2011 Cefla Impianti New Hospital Perugia Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
2009/2010 Ediltecno Restauri Vigevano New Hospital Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
2009 Ediltecno Restauri Pavia Hospital retrofit Project Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo)
2009 Metano Impianti Gas Station in Tripoli Lebanon Pre-Commissioning, Commissioning, Start-up, operation and maintenance up to take over.
2009 S.T.E. Energy Cogeneration Plant Monza Italy Commissioning, Start-up and operation up to take over.
2009 Termigas S.p.A. Palace Hotel Monza e Brianza HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2009 Carlo Gavazzi Impianti Garden City Milano HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2009 Cefla Impianti Passante di Via Stalingrado (BO) HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System.
2008 CIAB s.c.a.r.l New Hospital Trieste Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2008 Bruno Romeo S.p.A Malpensa Airport Milan Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2008 Busi Impianti S.p.A. Al Fateh Tower Khartoum Sudan HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2007/2008 Cofathec S.p.A New Hospital Mestre Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System.
2007 Busi Impianti S.p.A New Maggiore Hospital Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System.
2007 CIAB s.c.a.r.l Faculty of Engineering Bologna Italy HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2007 Termigas S.p.A New Institute of Biomedical search Mario Negri, Bovisa Milan Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2007 Consorzio Impianti Trigoria Campus Bio-Medical Rome Italy HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2006 Cefla Impianti Commercial center Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System.
2006 Cefla Impianti Building Unipol Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System.
2006 B&B INGG. Al Rabta Pharmaceutical Plant Lybia HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2006 Cofathec S.p.A New Hospital Varese Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System.
2005/2006 Cefla Impianti New Hospital Modena Baggiovara Italy Baggiovara Italy
HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System.
2005 Bonatti S.p.A NC 41 Gas Station Lybia HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2005 Cefla Impianti New Hospital Sacco Mialn Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2005 Cefla Impianti AC 10 Hotel Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test.
2004 Aster S.p.A Milan Fair New complex Rho/Pero Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2004 Cefla Impianti New Hospital Castel S.Pietro Bologna Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System.
2004 Bonatti S.p.A Mellitah Gas Station Lybia HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2004 Cefla Impianti Building Linear Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2004 Carlo Gavazzi Impianti H3G Trezzano S/N Milan Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2003/2004 Aerimpianti S.p.A. New Center “Il sole 24 News paper ” Milan Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2003 Cefla Impianti Commercial center Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2003 Cefla Impianti New Office Building Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2000/2002 API Raffineria IGCC Plant Falconara – (Italy) Management of commissioning and start-up activities up to take over.
1999/2000 Sagem Ansaldo Waste Incinerator R.S.U. – Verona (Italy) Supervision for commissioning and start-up activities.
1998 KTI Fibres plant Piatra Neamt (Romania) Supervision for installation, commissioning and start-up.
1997/1998 Fiat Avio Cogeneration plants Cassino – Termoli – Melfi (Italy) Management of commissioning and start-up activities up to take over.
1997 Nova Spa Salt recovery and plant Ghor Afsafi (Giordania) Supervision of erection, commissioning and start-up.
1996 Ctip Condensate Treatement plant Quadirpur (Pakistan) Supervision of commissioning and start-up activities.
1996 Ctip Etylene plant Puyang (China) Management of commissioning and start-up activities.
1996 Tozzi sud ELF N’Kossa Platform Mod. M3/M4 Supervision of electrical and instruments pre-commissioning activities and relevant Q.C. Procedures.
1995 Belleli M30/M40 oil Platform Hibernia Project Taranto (Italy) Pre-commissioning activities for electrical and instrument disciplines.
1993/1994 Bonatti Spa Steam Boiler Agip Oil Company Bu Attifel /Libya) Installation, commissioning, start-up, operation up to take over.
1993/1994 Bonatti Spa NGL Recovery Plant Electrical & Instrument ,HVAC system and fire fighting system Commissioning and Start-up activities.
1992/1993 Bonatti Spa Condesate Pipeline Agip Oil Company Bu Attifel (Libya) Electrical & Instrument Project management. commissioning, start-up activities, operations up to take over.
1991/1992 Bonatti Spa G.o.s.p Assamoud Sirte Oil Company Brega (Libya) Electrical & Instrument Project management, commissioning, start-up activities, operation up to take over.
1990/1991 Bonatti Spa G.o.s.p. o-o structure Agip Oil Company Bu Attifel (Libya) Electrical & Instrument Project management for erection, commissioning and start-up activities, operation up to take over.
1989/1990 Nuova Samin Exhausted Battery treatment Plant Milano (Italy) Electrical & Instrument Pre-commissioning, commissioning, and start-up. Test-run, operation up to take over.
1987/1988 Enichem Ipocalcium plant Saline di Volterra (Italy) Process, electrical, instruments commissioning and start-up activities. Plant operation up to take over.
1985/1986 Oronzio De Nora Clorine Soda plant Cagliari (Italy) Rumianca Electrical & Instrument Project coordinator for installation, commissioning, start-up, operation up to take over.
1984/1985 Oronzio De Nora Seaclor Plant (Algerie) Sonelgas Erection supervision, commissioning , start-up, operation up to take over.
1982/1984 G.I.E. Ansaldo Power Station 4×320 Mw Bandar Abbas (Iran) Process operation, Mechanical, Electrical, Instruments, commissioning and start-up activities up to take over of unit N° 1 and 2.