HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
YEAR | COMPANY | PROJECT | SERVICE |
2015 | CONSORZIO MONSERRATO | NEW UNIVERSITY BUILDINGS MONSERRATO (CA) |
Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Laboratory TAB |
2015 | BILFINGER SIELV | CHIOGGIA HOSPITAL | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2015 | ITEC | MANGIAGALLI HOSPITAL | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2015 | SCOTTA | New Ospital CO.RE Reggio Emilia | DALT Duct Air Leakage Test ( Prova di tenuta canali aeraulici) |
2015 | BILFINGER SIELV | BELLUNO HOSPITAL | Testing adjusting and balancing activities for heating, ventilation and air conditioning sterilization department. |
2015 | BILFINGER SIELV | VIZZOLO MN HOSPITAL | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2015 | CIAB | New Ospital B.go Roma Verona | DALT Duct Air Leakage Test ( Prova di tenuta canali aeraulici) |
2015 | BILFINGER SIELV | NEW BUILDING UNIVERSITY CA FOSCARI VENICE | Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms |
2015 | BILFINGER SIELV | PADOVA HOSPITAL | Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms |
2015 | Cefla Impianti | UNIPOL CED BOLOGNA | Testing adjusting and balancing activities for heating, ventilation and air conditioning |
2015 | MEREGALLI | BOLTON ALIMENTARI | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2015 | Cefla Impianti | UNIPOL MILANOFIORI | Testing adjusting and balancing activities for heating, ventilation and air conditioning |
2015 | STUDIO ALTIERI | DUBAI (AL JALILA HOSPITAL) | Functional test for heating, ventilation and air conditioning system. |
2015 | COSAP | US NAVY BUILDINGS | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2015 | CARLO GAVAZZI | AREA EX-BOSCHI PARMA | Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Stazione, Hotel, reidencial building |
2015 | Cefla Impianti | UNIPOL TORRE TIKAL MILANO | Testing adjusting and balancing activities for heating, ventilation and air conditioning |
2014/2015 | Cefla Impianti | CITY LIFE – TORRE ISOZAKI – MILANO | Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Building |
2014/2015 | GIANNI BENVENUTO | COVEXPO MILANO N. 7 BUILDINDS | Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings |
2014 | GIANNI BENVENUTO | Marriott Hotel Sacca Sessola Venezia | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2014 | USL2 LUCCA | Construction of Four New Hospitals | Testing adjusting and balancing activities for heating, ventilation and air conditioning of large equipment : CAT, MRI Scan, Computerizing Tomography. |
2014 | BAL.CO | Construction of five new residential buildings | Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system |
2014 | CIAB | New Ospital ward Santobono Naples | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2014 | CIAB | Rocchetta Mattei Castle | Testing adjusting and balancing activities for heating, ventilation and air conditioning. Functional test VRV system. |
2014 | CIAB | Nova Coop Vercelli | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2013 | AUSL MODENA | Osp. di Carpi Comparto Operatorio | Verifica del flusso laminare su diffusore a plafone sale operatorie. |
2013 | Merlo Lino Impianti | Osp. di Carpi Comparto Operatorio | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2013 | Co. Sat. Osp. Prato | Construction of Four New Hospitals | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2013 | Rosetti Marino S.P.A. | West Franklin oil platforme | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2013 | Co. Sat. Osp. Pistoia | Construction of Four New Hospitals | Testing adjusting and balancing activities for heating, ventilation and air conditioning. |
2014 | A & T | New Hospital Modena Baggiovara Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo). |
2013 | Cefla Impianti | Politecnico Milano Laboratori di Ingegneria Nucleare | Testing adjusting and balancing activities for heating, ventilation and air conditioning included firefighting system. |
2012/2013 | Meregalli s.r.l | Nuovo Palazzo Uffici Generali Viale Don Sturzo (Milano) | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. |
2012/2013 | Serfrigo srl | Kashagan Experimental Programme Kazakistan | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air distribution System. Buildings Blower Door Test. |
2012 | London Stock Exchange | Group Holdings Italian Branch Borsa di Milano | Performance test of Heating, Ventilation and Air Conditioning system |
2012 | CIAB s.c.a.r.l | Ospedale Rizzoli Bologna | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. Operating Rooms. |
2012 | STIM srl | GENOVA HIGH TECH S.p.A. | Technical supervision for the testing adjusting and balancing activities of heating, ventilation and air conditioning included firefighting system. |
2012 | Gesco srl | Shipyard Sestri Ponente “OCEANIA RIVIERA” | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. |
2011/2012 | Cefla Impianti | Yard Porta Nuova Garibaldi Milano | Technical supervision for the testing adjusting and balancing activities of heating, ventilation and air conditioning included firefighting system. |
2011/2012 | SIRAM S.p.A. | New Hospital Cona (Ferrara) Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System. |
2011 | JV Skema Tozzi | DI Temporary Refuge Kashagan Experimental Programme | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. Caibration and Loop check with building automation System. |
2011 | CIAB s.c.a.r.l | Museum Palazzo Fava Bologna | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. |
2011 | Techint S.p.A. | EMethanex Damietta Egypt | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. |
2010/2011 | CIAB s.c.a.r.l | New Hospital Giovanni Paolo II Olbia Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System. |
2010/2011 | NOB | New Hospital Bergamo Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo) n° 36 Operating Rooms, n°226 Laboratories, n°1200 Hospital Beds, 320.000 Square meters. |
2010/2011 | CIAB s.c.a.r.l | New Hospital S.Orsola Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System |
2010/2011 | Cefla Impianti | New Hospital Perugia Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo). |
2009/2010 | Ediltecno Restauri | Vigevano New Hospital Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo). |
2009 | Ediltecno Restauri | Pavia Hospital retrofit Project Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo) |
2009 | Metano Impianti | Gas Station in Tripoli Lebanon | Pre-Commissioning, Commissioning, Start-up, operation and maintenance up to take over. |
2009 | S.T.E. Energy | Cogeneration Plant Monza Italy | Commissioning, Start-up and operation up to take over. |
2009 | Termigas S.p.A. | Palace Hotel Monza e Brianza | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System. |
2009 | Carlo Gavazzi Impianti | Garden City Milano | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2009 | Cefla Impianti | Passante di Via Stalingrado (BO) | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System. |
2008 | CIAB s.c.a.r.l | New Hospital Trieste Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System. |
2008 | Bruno Romeo S.p.A | Malpensa Airport Milan Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System. |
2008 | Busi Impianti S.p.A. | Al Fateh Tower Khartoum Sudan | HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2007/2008 | Cofathec S.p.A | New Hospital Mestre Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. |
2007 | Busi Impianti S.p.A | New Maggiore Hospital Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System. |
2007 | CIAB s.c.a.r.l | Faculty of Engineering Bologna Italy | HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2007 | Termigas S.p.A | New Institute of Biomedical search Mario Negri, Bovisa Milan Italy | HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2007 | Consorzio Impianti Trigoria | Campus Bio-Medical Rome Italy | HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2006 | Cefla Impianti | Commercial center Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System. |
2006 | Cefla Impianti | Building Unipol Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. |
2006 | B&B INGG. | Al Rabta Pharmaceutical Plant Lybia | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2006 | Cofathec S.p.A | New Hospital Varese Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. |
2005/2006 | Cefla Impianti | New Hospital Modena Baggiovara Italy | Baggiovara Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System. |
2005 | Bonatti S.p.A | NC 41 Gas Station Lybia | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2005 | Cefla Impianti | New Hospital Sacco Mialn Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2005 | Cefla Impianti | AC 10 Hotel Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test. |
2004 | Aster S.p.A | Milan Fair New complex Rho/Pero Italy | HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2004 | Cefla Impianti | New Hospital Castel S.Pietro Bologna Italy | HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. |
2004 | Bonatti S.p.A | Mellitah Gas Station Lybia | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2004 | Cefla Impianti | Building Linear Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. |
2004 | Carlo Gavazzi Impianti | H3G Trezzano S/N Milan Italy | HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2003/2004 | Aerimpianti S.p.A. | New Center “Il sole 24 News paper ” Milan Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision. |
2003 | Cefla Impianti | Commercial center Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. |
2003 | Cefla Impianti | New Office Building Bologna Italy | HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. |
2000/2002 | API Raffineria | IGCC Plant Falconara – (Italy) | Management of commissioning and start-up activities up to take over. |
1999/2000 | Sagem Ansaldo | Waste Incinerator R.S.U. – Verona (Italy) | Supervision for commissioning and start-up activities. |
1998 | KTI | Fibres plant Piatra Neamt (Romania) | Supervision for installation, commissioning and start-up. |
1997/1998 | Fiat Avio | Cogeneration plants Cassino – Termoli – Melfi (Italy) | Management of commissioning and start-up activities up to take over. |
1997 | Nova Spa | Salt recovery and plant Ghor Afsafi (Giordania) | Supervision of erection, commissioning and start-up. |
1996 | Ctip | Condensate Treatement plant Quadirpur (Pakistan) | Supervision of commissioning and start-up activities. |
1996 | Ctip | Etylene plant Puyang (China) | Management of commissioning and start-up activities. |
1996 | Tozzi sud ELF | N’Kossa Platform Mod. M3/M4 | Supervision of electrical and instruments pre-commissioning activities and relevant Q.C. Procedures. |
1995 | Belleli | M30/M40 oil Platform Hibernia Project Taranto (Italy) | Pre-commissioning activities for electrical and instrument disciplines. |
1993/1994 | Bonatti Spa | Steam Boiler Agip Oil Company Bu Attifel /Libya) | Installation, commissioning, start-up, operation up to take over. |
1993/1994 | Bonatti Spa | NGL Recovery Plant | Electrical & Instrument ,HVAC system and fire fighting system Commissioning and Start-up activities. |
1992/1993 | Bonatti Spa | Condesate Pipeline Agip Oil Company Bu Attifel (Libya) | Electrical & Instrument Project management. commissioning, start-up activities, operations up to take over. |
1991/1992 | Bonatti Spa | G.o.s.p Assamoud Sirte Oil Company Brega (Libya) | Electrical & Instrument Project management, commissioning, start-up activities, operation up to take over. |
1990/1991 | Bonatti Spa | G.o.s.p. o-o structure Agip Oil Company Bu Attifel (Libya) | Electrical & Instrument Project management for erection, commissioning and start-up activities, operation up to take over. |
1989/1990 | Nuova Samin | Exhausted Battery treatment Plant Milano (Italy) | Electrical & Instrument Pre-commissioning, commissioning, and start-up. Test-run, operation up to take over. |
1987/1988 | Enichem | Ipocalcium plant Saline di Volterra (Italy) | Process, electrical, instruments commissioning and start-up activities. Plant operation up to take over. |
1985/1986 | Oronzio De Nora | Clorine Soda plant Cagliari (Italy) Rumianca | Electrical & Instrument Project coordinator for installation, commissioning, start-up, operation up to take over. |
1984/1985 | Oronzio De Nora | Seaclor Plant (Algerie) Sonelgas | Erection supervision, commissioning , start-up, operation up to take over. |
1982/1984 | G.I.E. Ansaldo | Power Station 4×320 Mw Bandar Abbas (Iran) | Process operation, Mechanical, Electrical, Instruments, commissioning and start-up activities up to take over of unit N° 1 and 2. |