HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).

YEAR COMPANY PROJECT SERVICE
2022 ING. FERRARI FIDIA PHARMACEUTICAL PLANT ABANO TERME Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems. Instrument calibration and Plant qualification.
2022 SOIMOD PHARMA FOOD RESEARCH OSIO SOPRA Testing adjusting and balancing activities for heating, ventilation and air conditioning systems.
2022 SANOFI SANOFI PHARMACEUTICAL PLANT SCOPPITO Testing adjusting and balancing of hydronic systems SHW.
2022 SICIET TENGIZ – KAZAKHSTAN HVAC Commissioning Service Activities. HVAC Air Balance Specialist and Supervisor.
2022 SOCOTIS SANOFI PHARMACEUTICAL PLANT SCOPPITO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2022 CAMST NEW PMA DEPARTMENT Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021/2022 GEDI GROUP NEW HOSPITAL FORNAROLI MAGENTA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021/2022 ALEXSISTEMI LIVORNO YARD DALT AIR DUCT Duct Air Leakage Test according to SMACNA manual.
2021/2022 LUXOTTICA VIA TORTONA, 35 Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 OPOCRIN LABORATORI DERIVATI ORGANICI TRINO VERCELLESE Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 IDROTERMICA ELBA NUOVA STRUTTURA R.S.A. RESIDENZIALE SANITARIO-ASSISTENZIALE PER ANZIANI ALBANO S. ALESSANDRO (BG) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 GRUPPO TONON FONDO MONTEROSA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 CEL S.p.A. GENERALI OFFICE BUILDING PIAZZETTA BOSSI Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 BOUYGUES MILANOFIORI OFFICE BUILDINGS U1-U3 Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 ROSETTI MARINO S.p.A. TYRA DEVELOPMENT PROJECT OIL PLATFORM Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 ENRICO COLOMBO SISTER NUOVA CLEAN ROOM IMD5 STRADA PROVINCIALE 90-VAIANO CREMASCO (CR) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 LOMBARDINI 22 SUPERNAP DATA CENTER 42000 SQUARE METER Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 BOUYGUES OFFICE BUILDING MILANOFIORI 13 AND 12 FLO0RS Testing adjusting and balancing activities for heating, ventilation and air conditioning.Balancing of hydronic systems. Balancing of hydronic systems.
2021 IDROTERMICA ELBA RSA TREVIOLO Testing adjusting and balancing activities for heating, ventilation and air conditioning.Balancing of hydronic systems.Balancing of hydronic systems.
2021 ENRICO COLOMBO SPA SIS-TER SPA Testing adjusting and balancing activities for heating, ventilation and air conditioning.Balancing of hydronic systems.
2021 AERTERMICA ST ELETRONICS AGRATE BRIANZA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 UNITECH SRL PHARMACEUTICAL PLANT ROSIA (SI) Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 LONGHI SPA SHOPPING CENTER ESSELUNGA LIVORNO (LI) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 CEL S.p.A. SIMIS S.R.L. – VIA PASTEUR, 10 – 20014 NERVIANO (MI) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Stabulari.
2021 CEL S.p.A. HUMANITAS GRADENIGO HOSPITAL DAL & TAB SURGERY ROOMS Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 TERMO-IN TETRAPAK NEW BUILDING “EX CARETTI”-MODENA LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems. Balancing of hydronic systems.
2021 MONTAGGI GENERALI SRL OSPEDALE DEI BAMBINI “PIETRO BARILLA” REQUALIFICATION OF INTENSIVE CARE AND OPERATING BLOCK Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2021 CIAB PRIMARY SCHOOL “DE AMICIS” VIA MARCO RIZZOLI PIEVE DI CENTO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 CIAB WASTE WATER PURIFIER OF RAPALLO MUNICIPALITY ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 UNITECH SRL MATER DEI HOSPITAL MALTA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2021 CIAB SCHOOL LIBRERY AND CARABINIERI BARRACKS GALLIERA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 ITEC MANGIAGALLI HOSPITAL NEW COVID DEPARTMENT Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 UNITECH SRL PHARMACEUTICAL PLANT SIGFRIED MALTA Ltd Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 SHOPPING CENTER ESSELUNGA GENOVA (TO) ESSELUNGA STORE NICHELINO (TO) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 LONGHI SPA ESSELUNGA STORE NICHELINO (TO) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 TEKNO SERVICE HOSP. HUMANITAS NEW COVID DEPARTMENT Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 GARC SPA FERRETTI-NEW HEADQUARTERS DARSENE-LA SPEZIA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems
2020 BOUYGUES OFFICE BUILDING URBAN CUBE MILAN ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 DABAR COSTRUZIONI SPA POLICLINICO HOSPITAL BARI ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 DABAR COSTRUZIONI SPA REGIONE PUGLIA HOSPITAL FOGGIA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 TEKNO SERVICE MODENA HOSPITAL BAGGIOVARA NEW COVID DEPARTMENT Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 SIRAM S.p.A. HOSPITAL MAGGIORE PARMA NEW COVID DEPARTMENT EMERGENCY DEPARTMENT Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 SIRAM S.p.A. HOSPITAL MAGGIORE PARMA NEW COVID DEPARTMENT ALA SUD Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 CEFLA SHOWROOM IMOLA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 ENGIE GENERALI INSURANCE S.p.A. MOGLIANO VENETO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 COSTIGLIOLA ANTONIO SRL OFFICE BUILDING ATS MILANO ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 SOIMAR GROUP S.P.A. SPIN S.p.A. TORVISCOSA CLEAN ROOM NEW IOMEPROLO PLANT ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems. HEPA
FILTERS INTEGRITY VERIFICATION
2020 CAMST Soc. Coop RENOVATIO OF CAVAGNARI OFFICE BUILDING PARMA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 NA. GEST. GLOBAL SERVICE S.r.l. Università Campus Bio-Medico di Roma Ducts sealing and Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 SIRAM S.p.A. OSP. MAGGIORE PARMA NUOVO REPARTO COVID Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 CEFLA TORRE UNIFIMM BOLOGNA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2020 BOUYGUES ESSELUNGA MONTECATINI Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 BOUYGUES CHIESI FARMACEUTI NEW HEADQUARTER LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2020 AUSL MODENA Hospital Pavullo Testing adjusting and balancing activities for heating, ventilation and air conditioning. Classification of airborne molecular contamination.
2020 CEFLA UNIPOL SEDI Plant performance test.
2020 MEREGALLI METRO BLU Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 OPUS COSTRUZIONI CAMP DARBY LIVORNO US NAVY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 FLL.I FRANCHINI CFT PARMA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 CONSORZIO PEDRON OSP. MOLINETTE Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 APLEONA ISTITUTO ZOOPROFILATTICO Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 BOUYGUES BNL ROMA Via Lombardia LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 BOUYGUES BOLOGNA ESSELUNGA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 SIRIMED New Hospital Modena Baggiovara Italy Classification of airborne molecular contamination.
2019 CEFLA IMPIANTI UNIPOL VIA Guinizelli LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 ALPIQ DOMPÈ PHARMACEUTICAL PLANT Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2019 CIAB HOSPITAL RETROFIT POLICLINICO MODENA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 TERMO IN HOSPITAL RETROFIT POLICLINICO MODENA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2019 NUOVA OMPI SRL PIOMBINO DESE PHARMACEUTICAL PLANT Instrument calibration and test of absolute filter (hepa / ulpa) leak test.
2019 TAGLIABUE SPA VIA CORDUSIO,2 MILAN OFFICE BUILDING LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2019 AUSL MODENA ITALY HYBRID OPERATING ROOM Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2018 ALPIQ IN-TEC PHARMACEUTICAL PLANT NUOVA OMPI PIOMBINO DESE ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Field Instrument calibration
2018 SOLUZIONI ENERGETICHE SACCHETTIFICIO CORAZZA PADOVA ITALY Automatic warehouse building Blower Door Test.
2018 A&T HOSPITAL RETROFIT POLICLINICO MODENA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2018 ALPIQ IN-TEC PHARMACEUTICAL PLANT DOMPE’ L’AQUILA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2018 MEREGALLI SRL ELI LILLY PHARMACEUTICAL PLANT SESTO FIORENTINO ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2018 TECNO ARIA SRL BOLOGNA AIRPORT ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. Loop Check SPV System and Field.
2018 ELEF DENMARK COPENHAGEN CITY RING UNDERGROUND Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic systems.
2018 TERMIGAS S.p.A. BREMBO FACTORY POLAND Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2018 KHVZ ANLAGER New Hospital Bolzano (BZ) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system. Loop Check Siemens Desigo and Field.
2018 TAGLIABUE SPA VIA CARDUCCI MILAN OFFICE BUILDING LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2018 CEFLA IMPIANTI UNIPOL OFFICE BUILDING Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2018 CONSORZIO PEDRON PHARMACEUTICAL LABORATORIES ORBASSANO Testing adjusting and balancing activities for heating, ventilation and air conditioning. System Commissioning.
2018 BRM IMPIANTI DIACARE TECHNOLOGIES JEDDAH SAUDI ARABIA Operatione Qualificatin Protocols IQ / OQ particle count, absolute filter integrity
2018 SITAIMPIANTI PIZZAROTTI HEADQUARTER PARMA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2018 TERMIGAS S.p.A. COPENHAGHEN SUBWAY CITYRINGEN Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2018 APLEONA VIZZOLO HOSPITAL STERILIZATION PLANT Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2018 EUROIMPIANTI CARIPARMA OFFICE BUILDING LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2017 APLEONA EUROPEAN SCHOOL PARMA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 ECUBE MEDICAL CENTRE FONIATRIA PADOVA Classification of air clealiness by particle concentration surgery room according to UNI EN ISO 14644-1
2017 ARCO COSTRUZIONI GENERALI SANTA MARIA LE SCOTTE HOSPITAL SIENA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 APLEONA VENICE AIRPORT Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system. System Commissioning.
2017 FRIGOMECCANICA OIL PLATFORM ALEXANDRIA EGYPT Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system. System Commissioning.
2017 CEFLA IMPIANTI POLYCLINICS IMOLA BOLOGNA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 F.LLI FRANCHINI FILENI PLANT CIGNOLI Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 CEFLA IMPIANTI COIMA HEADQUARTER MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 TEAM ENGINEERING HP HEADQUARTER MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 FAST WIMBLEDON AIR HANDLIG UNITS Air handling units – Mechanical Performance according to UNI EN 1886
2017 CARLO GAVAZZI IMPIANTI SANDBLASTING PLANT MONFALCONE Testing adjusting and balancing activities for heating, ventilation and air conditioning
2017 AERTERMICA OFFICE BUILDING LEED CERTIFIED Testing adjusting and balancing activities for heating, ventilation and air conditioning
2017 CAMST PICCOLE FIGLIE HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning
2017 CEFLA IMPIANTI FI.CO SHOPPING MALL BOLOGNA Testing adjusting and balancing activities for heating, ventilation and air conditioning
2017 CEFLA IMPIANTI TORRE ALLIANZ MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 APLEONA PEDIATRIC POLYCLINICS PARMA Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 LUCATO IMPIANTI GREISERHOF HOSPITAL BOLZANO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 F.LLI FRANCHINI RIMINI FAIR Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 PEGAM CASA DELLA SALUTE NAVILE (BO) Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 APLEONA MONTEBELLUNA HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning fo Surgery room
2017 APLEONA CASTELFRANCO VENETO HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning fo Surgery room
2017 CONSORZIO PEDRON DEA OSP. ORBASSANO Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2017 TOZZI SUD TOTAL TEMPA ROSSA OIL PROJECT (ITALY) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2017 CIAB New Hospital Borgo Roma (VR) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2017 GELMINI IMPIANTI New Hospital Borgo Trento (VR) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2016 PHARMATECH FARMABIOS ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning. HEPA/ULPA filters DOP leak test emery oil test.
2016 CSV LIFE SCIENCE Sanamed Pharma Industries Teheran (Iran) Testing adjusting and balancing activities, classification for of airborne molecular contamination.
2016 Meregalli Srl Actavis pharmaceutical laboratories Nerviano Italy Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2016 Meregalli Srl BAYER HEALTHCARE MANUFACTURING Garbagnate Factory Italy Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system. HEPA/ULPA filters DOP leak test emery oil test
2016 GRUPPO GEDI Maria Teresa Hospital Firenze Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2016 TECNINOX SCOPPITO (AQ) PROGETTO AIR LOCK SANOFI S.p.A. Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2016 Gelmini Impianti New Hospital B. Trento (VR) Italy DALT Duct Air Leakage Test
2016 Soluzioni Energetiche Soluzioni Energetiche Blower Door Test EN13829 (Volume 330 mc)
2016 SITECO New Hospital Montecchio Italy DALT Duct Air Leakage Test
2016 MICHELETTO IMPIANTI NEW HOSPITAL VAIO FIDENZA ITALY Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2016 BILFINGER SIELV PADOVA HOSPITAL 4° Floor Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms
2016 CIAB Bigiavi Library Bologna Italy Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2016 CONSORZIO RFX NEUTRAL BEAM TEST FACILITY PADOVA ITALY EXPERIMENTAL PROJECT Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2016 Fincantieri Shipyard Marghera (Venice) “NEW HOLLAND AMERICA LINE” Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system.
2015/2016 CONSORZIO MONSERRATO NEW UNIVERSITY BUILDINGS MONSERRATO (CA) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Laboratory TAB.
2015 CONSORZIO MONSERRATO NEW UNIVERSITY BUILDINGS MONSERRATO (CA) Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Laboratory TAB
2015 BILFINGER SIELV CHIOGGIA HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 ITEC MANGIAGALLI HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 SCOTTA New Ospital CO.RE Reggio Emilia DALT Duct Air Leakage Test ( Prova di tenuta canali aeraulici)
2015 BILFINGER SIELV BELLUNO HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning sterilization department.
2015 BILFINGER SIELV VIZZOLO MN HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 CIAB New Ospital B.go Roma Verona DALT Duct Air Leakage Test ( Prova di tenuta canali aeraulici)
2015 BILFINGER SIELV NEW BUILDING UNIVERSITY CA FOSCARI VENICE Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms
2015 BILFINGER SIELV PADOVA HOSPITAL Testing adjusting and balancing activities for heating, ventilation and air conditioning of Surgery Rooms
2015 Cefla Impianti UNIPOL CED BOLOGNA Testing adjusting and balancing activities for heating, ventilation and air conditioning
2015 MEREGALLI BOLTON ALIMENTARI Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 Cefla Impianti UNIPOL MILANOFIORI Testing adjusting and balancing activities for heating, ventilation and air conditioning
2015 STUDIO ALTIERI DUBAI (AL JALILA HOSPITAL) Functional test for heating, ventilation and air conditioning system.
2015 COSAP US NAVY BUILDINGS Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2015 CARLO GAVAZZI AREA EX-BOSCHI PARMA Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings. Stazione, Hotel, reidencial building
2015 Cefla Impianti UNIPOL TORRE TIKAL MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning
2014/2015 Cefla Impianti CITY LIFE – TORRE ISOZAKI – MILANO Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system.
Energy Saving Building
2014/2015 GIANNI BENVENUTO COVEXPO MILANO N. 7 BUILDINDS Testing adjusting and balancing activities for heating, ventilation and air conditioning. Commissioning and start-up of hydronic system. Energy Saving Buildings
2014 GIANNI BENVENUTO Marriott Hotel Sacca Sessola Venezia Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2014 USL2 LUCCA Construction of Four New Hospitals Testing adjusting and balancing activities for heating, ventilation and air conditioning of large equipment : CAT, MRI Scan, Computerizing Tomography.
2014 BAL.CO Construction of five new residential buildings Testing adjusting and balancing activities for heating, ventilation and air conditioning. Balancing of hydronic system
2014 CIAB New Ospital ward Santobono Naples Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2014 CIAB Rocchetta Mattei Castle Testing adjusting and balancing activities for heating, ventilation and air conditioning. Functional test VRV system.
2014 CIAB Nova Coop Vercelli Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 AUSL MODENA Osp. di Carpi Comparto Operatorio Verifica del flusso laminare su diffusore a plafone sale operatorie.
2013 Merlo Lino Impianti Osp. di Carpi Comparto Operatorio Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 Co. Sat. Osp. Prato Construction of Four New Hospitals Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 Rosetti Marino S.P.A. West Franklin oil platforme Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2013 Co. Sat. Osp. Pistoia Construction of Four New Hospitals Testing adjusting and balancing activities for heating, ventilation and air conditioning.
2014 A & T New Hospital Modena Baggiovara Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
2013 Cefla Impianti Politecnico Milano Laboratori di Ingegneria Nucleare Testing adjusting and balancing activities for heating, ventilation and air conditioning included firefighting system.
2012/2013 Meregalli s.r.l Nuovo Palazzo Uffici Generali Viale Don Sturzo (Milano) HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System.
2012/2013 Serfrigo srl Kashagan Experimental Programme Kazakistan HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air distribution System. Buildings Blower Door Test.
2012 London Stock Exchange Group Holdings Italian Branch Borsa di Milano Performance test of Heating, Ventilation and Air Conditioning system
2012 CIAB s.c.a.r.l Ospedale Rizzoli Bologna HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. Operating Rooms.
2012 STIM srl GENOVA HIGH TECH S.p.A. Technical supervision for the testing adjusting and balancing activities of heating, ventilation and air conditioning included firefighting system.
2012 Gesco srl Shipyard Sestri Ponente “OCEANIA RIVIERA” HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2011/2012 Cefla Impianti Yard Porta Nuova Garibaldi Milano Technical supervision for the testing adjusting and balancing activities of heating, ventilation and air conditioning included firefighting system.
2011/2012 SIRAM S.p.A. New Hospital Cona (Ferrara) Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2011 JV Skema Tozzi DI Temporary Refuge Kashagan Experimental Programme HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. Caibration and Loop check with building automation System.
2011 CIAB s.c.a.r.l Museum Palazzo Fava Bologna HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2011 Techint S.p.A. EMethanex Damietta Egypt HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2010/2011 CIAB s.c.a.r.l New Hospital Giovanni Paolo II Olbia Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2010/2011 NOB New Hospital Bergamo Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System (Siemens Desigo) n° 36 Operating Rooms, n°226 Laboratories, n°1200 Hospital Beds, 320.000 Square meters.
2010/2011 CIAB s.c.a.r.l New Hospital S.Orsola Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System
2010/2011 Cefla Impianti New Hospital Perugia Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
2009/2010 Ediltecno Restauri Vigevano New Hospital Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo).
2009 Ediltecno Restauri Pavia Hospital retrofit Project Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air and Hydonic System. VAV calibration and Loop check with building automation System ( Siemens Desigo)
2009 Metano Impianti Gas Station in Tripoli Lebanon Pre-Commissioning, Commissioning, Start-up, operation and maintenance up to take over.
2009 S.T.E. Energy Cogeneration Plant Monza Italy Commissioning, Start-up and operation up to take over.
2009 Termigas S.p.A. Palace Hotel Monza e Brianza HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2009 Carlo Gavazzi Impianti Garden City Milano HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2009 Cefla Impianti Passante di Via Stalingrado (BO) HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System.
2008 CIAB s.c.a.r.l New Hospital Trieste Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2008 Bruno Romeo S.p.A Malpensa Airport Milan Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System. VAV calibration and Loop check with building automation System.
2008 Busi Impianti S.p.A. Al Fateh Tower Khartoum Sudan HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2007/2008 Cofathec S.p.A New Hospital Mestre Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System.
2007 Busi Impianti S.p.A New Maggiore Hospital Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System.
2007 CIAB s.c.a.r.l Faculty of Engineering Bologna Italy HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2007 Termigas S.p.A New Institute of Biomedical search Mario Negri, Bovisa Milan Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2007 Consorzio Impianti Trigoria Campus Bio-Medical Rome Italy HVAC Commissioning and Start-up. Testing , Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2006 Cefla Impianti Commercial center Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, System.
2006 Cefla Impianti Building Unipol Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System.
2006 B&B INGG. Al Rabta Pharmaceutical Plant Lybia HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2006 Cofathec S.p.A New Hospital Varese Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System.
2005/2006 Cefla Impianti New Hospital Modena Baggiovara Italy Baggiovara Italy
HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. VAV calibration and Loop check with building automation System.
2005 Bonatti S.p.A NC 41 Gas Station Lybia HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2005 Cefla Impianti New Hospital Sacco Mialn Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2005 Cefla Impianti AC 10 Hotel Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test.
2004 Aster S.p.A Milan Fair New complex Rho/Pero Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2004 Cefla Impianti New Hospital Castel S.Pietro Bologna Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System.
2004 Bonatti S.p.A Mellitah Gas Station Lybia HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2004 Cefla Impianti Building Linear Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2004 Carlo Gavazzi Impianti H3G Trezzano S/N Milan Italy HVAC Commissioning and Start-up.Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2003/2004 Aerimpianti S.p.A. New Center “Il sole 24 News paper ” Milan Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air, and Hydronic System. Fire fighting system test and Loop check with building automation Supervision.
2003 Cefla Impianti Commercial center Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2003 Cefla Impianti New Office Building Bologna Italy HVAC Commissioning and Start-up. Testing, Adjusting, and Balancing of Air System.
2000/2002 API Raffineria IGCC Plant Falconara – (Italy) Management of commissioning and start-up activities up to take over.
1999/2000 Sagem Ansaldo Waste Incinerator R.S.U. – Verona (Italy) Supervision for commissioning and start-up activities.
1998 KTI Fibres plant Piatra Neamt (Romania) Supervision for installation, commissioning and start-up.
1997/1998 Fiat Avio Cogeneration plants Cassino – Termoli – Melfi (Italy) Management of commissioning and start-up activities up to take over.
1997 Nova Spa Salt recovery and plant Ghor Afsafi (Giordania) Supervision of erection, commissioning and start-up.
1996 Ctip Condensate Treatement plant Quadirpur (Pakistan) Supervision of commissioning and start-up activities.
1996 Ctip Etylene plant Puyang (China) Management of commissioning and start-up activities.
1996 Tozzi sud ELF N’Kossa Platform Mod. M3/M4 Supervision of electrical and instruments pre-commissioning activities and relevant Q.C. Procedures.
1995 Belleli M30/M40 oil Platform Hibernia Project Taranto (Italy) Pre-commissioning activities for electrical and instrument disciplines.
1993/1994 Bonatti Spa Steam Boiler Agip Oil Company Bu Attifel /Libya) Installation, commissioning, start-up, operation up to take over.
1993/1994 Bonatti Spa NGL Recovery Plant Electrical & Instrument ,HVAC system and fire fighting system Commissioning and Start-up activities.
1992/1993 Bonatti Spa Condesate Pipeline Agip Oil Company Bu Attifel (Libya) Electrical & Instrument Project management. commissioning, start-up activities, operations up to take over.
1991/1992 Bonatti Spa G.o.s.p Assamoud Sirte Oil Company Brega (Libya) Electrical & Instrument Project management, commissioning, start-up activities, operation up to take over.
1990/1991 Bonatti Spa G.o.s.p. o-o structure Agip Oil Company Bu Attifel (Libya) Electrical & Instrument Project management for erection, commissioning and start-up activities, operation up to take over.
1989/1990 Nuova Samin Exhausted Battery treatment Plant Milano (Italy) Electrical & Instrument Pre-commissioning, commissioning, and start-up. Test-run, operation up to take over.
1987/1988 Enichem Ipocalcium plant Saline di Volterra (Italy) Process, electrical, instruments commissioning and start-up activities. Plant operation up to take over.
1985/1986 Oronzio De Nora Clorine Soda plant Cagliari (Italy) Rumianca Electrical & Instrument Project coordinator for installation, commissioning, start-up, operation up to take over.
1984/1985 Oronzio De Nora Seaclor Plant (Algerie) Sonelgas Erection supervision, commissioning , start-up, operation up to take over.
1982/1984 G.I.E. Ansaldo Power Station 4×320 Mw Bandar Abbas (Iran) Process operation, Mechanical, Electrical, Instruments, commissioning and start-up activities up to take over of unit N° 1 and 2.